Our Facility
10 acres
Large air-conditioned tack room Custom built feed room Laundry Room with AC Full Bathroom with AC Extra Large (330' x 160') show quality arena with footing by IDA Development. Arena is equipped with drainage and irrigation & Jumps by DALMAN Jump Co, Burlingham Sports & CCI (used at WEF) ***Additional New 120' x 220' sand arena under construction set to be finished Fall 2022. 3 Acre grass hacking field. Indoor tack stalls Exterior wash racks 5 large Grass paddocks with drainage ***4 NEW grass paddocks: 100' x 110' under construction set to be finished Fall 2022. 3 24 hour surveillance. With staff that lives on-site 20 stall Concrete barn featuring 14'x14' stalls ALL with exterior windows, lights, treated city water, & high powered mounted fans and 27' high center aisle ceilings! and...a beautiful pond with native flora and fauna! 4 |
standard ACCOMMODATIONS(1) Box Stall, at least 14’ x 14’. (2) Bedding material as per SSS standard (medium pine flake shavings) (3) Daily turn out in GRASS paddocks. 4) Daily Grooming/ Bathing (5) Grain ration morning and evening (lunch if needed). (6) Hay given in the mornings and evenings and throughout the day. Up to 6 flakes a day. (7) Owner's fly masks, fly spray, boots, blankets and sheets will be applied as needed. Services: FULL SERVICE BOARD includes:
|